{"id":7655,"date":"2014-03-05T11:30:12","date_gmt":"2014-03-05T10:30:12","guid":{"rendered":"https:\/\/www.strukturholding.de\/en\/general\/zwei-grosstransformatoren-auf-tiefladern-rollen-an-strom-fuer-den-lisdorfer-berg\/"},"modified":"2017-07-05T09:23:55","modified_gmt":"2017-07-05T07:23:55","slug":"two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2","status":"publish","type":"post","link":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/","title":{"rendered":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg"},"content":{"rendered":"<h1>Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg<\/h1>\n<h2>Power for Lisdorfer Berg<\/h2>\n<p>They will transform the power that is supplied at 35 kilovolts into 20 kilovolts and distribute this to the operations at Lisdorfer Berg. The Saarland\u2019s Economic Promotion Corporation gwSaar is responsible for the development and marketing of Lisdorfer Berg. The affiliate company Leg Service is responsible for on-site project management.<\/p>\n<p>The power is supplied to the transformer over the Saar River by the substation at Ensdorf power plant. The transformer is to be completely connected to the grid by June.<br \/>\nEach of the two transformers weighs approximately 41 tonnes. The boxes comprise metal, coils, isolators \u2013 and ten tonnes of cooling liquids. The coils heat up during operation. This is why the transformers will be located outdoors. Also, as J\u00fcrgen Brettar, authorised representative for LEG-Service, tells us \u201cThey are placed on a concrete basins. In the event of an accident then the cooling liquid will run into this basin\u201d.<br \/>\nThe transformers are designed for 35 kilovolts. According to Brettar they can be converted to 110 kilovolts.<\/p>\n<p>One transformer is intended for use in ongoing operations. The other is a reserve system; if the first fails, for example, or during certain switching operations then the industrial park will not be left without power. The two transformers, which were produced in Germany, cost 3.1. million Euros in total.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg Power<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[55,14,13],"tags":[],"class_list":["post-7655","post","type-post","status-publish","format-standard","hentry","category-archive-2014","category-current-news","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar\" \/>\n<meta property=\"og:description\" content=\"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg Power\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/\" \/>\n<meta property=\"og:site_name\" content=\"SHS | Strukturholding Saar\" \/>\n<meta property=\"article:published_time\" content=\"2014-03-05T10:30:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-07-05T07:23:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.strukturholding.de\/wp-content\/uploads\/2016\/10\/og_image_strukturholding.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"fm2H2@frmtn.de\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"fm2H2@frmtn.de\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/\"},\"author\":{\"name\":\"fm2H2@frmtn.de\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/0bdda3f38102ef76ca8a1ea485f9e7d7\"},\"headline\":\"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg\",\"datePublished\":\"2014-03-05T10:30:12+00:00\",\"dateModified\":\"2017-07-05T07:23:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/\"},\"wordCount\":243,\"articleSection\":[\"Archive 2014\",\"Current News\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/\",\"name\":\"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#website\"},\"datePublished\":\"2014-03-05T10:30:12+00:00\",\"dateModified\":\"2017-07-05T07:23:55+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/0bdda3f38102ef76ca8a1ea485f9e7d7\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#website\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/\",\"name\":\"SHS | Strukturholding Saar\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.strukturholding.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/0bdda3f38102ef76ca8a1ea485f9e7d7\",\"name\":\"fm2H2@frmtn.de\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/author\\\/hdw\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/","og_locale":"en_US","og_type":"article","og_title":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar","og_description":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg Power","og_url":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/","og_site_name":"SHS | Strukturholding Saar","article_published_time":"2014-03-05T10:30:12+00:00","article_modified_time":"2017-07-05T07:23:55+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.strukturholding.de\/wp-content\/uploads\/2016\/10\/og_image_strukturholding.jpg","type":"image\/jpeg"}],"author":"fm2H2@frmtn.de","twitter_misc":{"Written by":"fm2H2@frmtn.de","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/#article","isPartOf":{"@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/"},"author":{"name":"fm2H2@frmtn.de","@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/0bdda3f38102ef76ca8a1ea485f9e7d7"},"headline":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg","datePublished":"2014-03-05T10:30:12+00:00","dateModified":"2017-07-05T07:23:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/"},"wordCount":243,"articleSection":["Archive 2014","Current News","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/","url":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/","name":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg - SHS | Strukturholding Saar","isPartOf":{"@id":"https:\/\/www.strukturholding.de\/#website"},"datePublished":"2014-03-05T10:30:12+00:00","dateModified":"2017-07-05T07:23:55+00:00","author":{"@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/0bdda3f38102ef76ca8a1ea485f9e7d7"},"breadcrumb":{"@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.strukturholding.de\/en\/two-large-transformers-to-roll-in-on-flat-bed-trailers-power-for-lisdorfer-berg-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.strukturholding.de\/en\/"},{"@type":"ListItem","position":2,"name":"Two large transformers to roll in on flat-bed trailers -\u2013 Power for Lisdorfer Berg"}]},{"@type":"WebSite","@id":"https:\/\/www.strukturholding.de\/#website","url":"https:\/\/www.strukturholding.de\/","name":"SHS | Strukturholding Saar","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.strukturholding.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/0bdda3f38102ef76ca8a1ea485f9e7d7","name":"fm2H2@frmtn.de","url":"https:\/\/www.strukturholding.de\/en\/author\/hdw\/"}]}},"_links":{"self":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts\/7655","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/comments?post=7655"}],"version-history":[{"count":0,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts\/7655\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/media?parent=7655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/categories?post=7655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/tags?post=7655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}