{"id":22587,"date":"2023-05-30T10:05:13","date_gmt":"2023-05-30T08:05:13","guid":{"rendered":"https:\/\/www.strukturholding.de\/?p=22587"},"modified":"2023-05-30T10:06:04","modified_gmt":"2023-05-30T08:06:04","slug":"leg-saar-enlarged-waellerichen-industrial-area-gets-started","status":"publish","type":"post","link":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/","title":{"rendered":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started"},"content":{"rendered":"<h1><strong>LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started<\/strong><\/h1>\n<p>From now on, even more companies can settle on the `W\u00e4llerichen` area near Tholey. LEG Saar, Landesentwicklungsgesellschaft Saarland, supported the community of Tholey in expanding the site in Hasborn-Dautweiler. Furthermore, the SHS subsidiary was in charge of the technical project management. On May 24th, the enlarged area was opened in the presence of Economics Minister J\u00fcrgen Barke.<\/p>\n<p>Valentin Holzer, Managing Director of LEG Saar, is pleased about the successful expansion: `LEG Saar as a a partner of the Saarland communities has once more fulfilled its task and made a significant contribution to relocate more companies here. So, we can together advance the development of our region`, he said on site.<\/p>\n<p>A part of the site was already developed a few years ago, and several medium-sized companies have meanwhile become established there. They also appreciate the commercial area because of its good transport links to the A1. Now it was about a usable area of a size almost comparable to a soccer field, located southeast of Hasborn-Dautweiler, above the existing industrial and commercial area `W\u00e4llerichen`.<\/p>\n<p>In line with the development plan for this project, various services were provided for the development of the site. So, the enlarged area has an access road including turning area with a total length of approx. 80 m and a width of 6.50 m. The road begins at the junction to Industriestra\u00dfe and then runs in an easterly direction.<br \/>\nThe area is located on a mountain slope with a southeast-northwest ground inclination. Therefore, it was terraced. Moreover, the water and power supply, street lighting as well as drainage were installed and a fire water tank was placed.<\/p>\n<p>The construction process, which started in May 2021 and raised a total cost of around 2.2 million euros, was handled via a trust account managed by LEG Saar. The Ministry of Economy subsidized the measure at 95 % of the eligible deficit of the measure. Mid-December 2022, construction was completed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started From now on, even more companies<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2,54,117],"tags":[],"class_list":["post-22587","post","type-post","status-publish","format-standard","hentry","category-general","category-legsaar-en-2","category-leg-saar-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar\" \/>\n<meta property=\"og:description\" content=\"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started From now on, even more companies\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/\" \/>\n<meta property=\"og:site_name\" content=\"SHS | Strukturholding Saar\" \/>\n<meta property=\"article:published_time\" content=\"2023-05-30T08:05:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-05-30T08:06:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.strukturholding.de\/wp-content\/uploads\/2016\/10\/og_image_strukturholding.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"roseburgard\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"roseburgard\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/\"},\"author\":{\"name\":\"roseburgard\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/6de28da221fc7edc231f999716e955c5\"},\"headline\":\"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started\",\"datePublished\":\"2023-05-30T08:05:13+00:00\",\"dateModified\":\"2023-05-30T08:06:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/\"},\"wordCount\":336,\"articleSection\":[\"General\",\"LEG Saar\",\"LEG Saar\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/\",\"name\":\"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#website\"},\"datePublished\":\"2023-05-30T08:05:13+00:00\",\"dateModified\":\"2023-05-30T08:06:04+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/6de28da221fc7edc231f999716e955c5\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#website\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/\",\"name\":\"SHS | Strukturholding Saar\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.strukturholding.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.strukturholding.de\\\/#\\\/schema\\\/person\\\/6de28da221fc7edc231f999716e955c5\",\"name\":\"roseburgard\",\"url\":\"https:\\\/\\\/www.strukturholding.de\\\/en\\\/author\\\/rose\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/","og_locale":"en_US","og_type":"article","og_title":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar","og_description":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started From now on, even more companies","og_url":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/","og_site_name":"SHS | Strukturholding Saar","article_published_time":"2023-05-30T08:05:13+00:00","article_modified_time":"2023-05-30T08:06:04+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/www.strukturholding.de\/wp-content\/uploads\/2016\/10\/og_image_strukturholding.jpg","type":"image\/jpeg"}],"author":"roseburgard","twitter_misc":{"Written by":"roseburgard","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/#article","isPartOf":{"@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/"},"author":{"name":"roseburgard","@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/6de28da221fc7edc231f999716e955c5"},"headline":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started","datePublished":"2023-05-30T08:05:13+00:00","dateModified":"2023-05-30T08:06:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/"},"wordCount":336,"articleSection":["General","LEG Saar","LEG Saar"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/","url":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/","name":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started - SHS | Strukturholding Saar","isPartOf":{"@id":"https:\/\/www.strukturholding.de\/#website"},"datePublished":"2023-05-30T08:05:13+00:00","dateModified":"2023-05-30T08:06:04+00:00","author":{"@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/6de28da221fc7edc231f999716e955c5"},"breadcrumb":{"@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.strukturholding.de\/en\/leg-saar-enlarged-waellerichen-industrial-area-gets-started\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/www.strukturholding.de\/en\/"},{"@type":"ListItem","position":2,"name":"LEG Saar : Enlarged `W\u00e4llerichen` industrial area gets started"}]},{"@type":"WebSite","@id":"https:\/\/www.strukturholding.de\/#website","url":"https:\/\/www.strukturholding.de\/","name":"SHS | Strukturholding Saar","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.strukturholding.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.strukturholding.de\/#\/schema\/person\/6de28da221fc7edc231f999716e955c5","name":"roseburgard","url":"https:\/\/www.strukturholding.de\/en\/author\/rose\/"}]}},"_links":{"self":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts\/22587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/comments?post=22587"}],"version-history":[{"count":3,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts\/22587\/revisions"}],"predecessor-version":[{"id":22590,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/posts\/22587\/revisions\/22590"}],"wp:attachment":[{"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/media?parent=22587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/categories?post=22587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.strukturholding.de\/en\/wp-json\/wp\/v2\/tags?post=22587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}